Skip to Content
System

Odour control scrubbers

Odour is a nuisance in law long before it is a hazard in concentration. Detection thresholds for reduced sulphur compounds sit in the low parts per billion, so an odour system is judged on the last fraction of a percent of removal — which is a different design problem from bulk gas cleaning.

  • H₂S
  • Mercaptans
  • NH₃
  • Amines
  • Organic sulphides
  • Fatty acids

The principle

Most odour duties are mixed: an acidic fraction such as hydrogen sulphide and mercaptans alongside an alkaline fraction such as ammonia and amines. No single liquor chemistry deals with both, which is why serious odour control is usually staged.

A typical arrangement is an acid stage to strip ammonia and amines, followed by an alkaline oxidant stage — sodium hydroxide with sodium hypochlorite — for the sulphur compounds, with activated carbon polishing where the boundary is sensitive.

Staged for mixed odours

Independent liquor circuits per stage, so the acid and alkaline chemistries are held separately and neither neutralises the other.

ORP and pH control

Oxidant is dosed on redox potential and alkali on pH, so the system holds its duty as the load varies through the day.

Carbon polishing where it counts

A final activated carbon bed catches the residual trace compounds that drive complaints near a sensitive boundary.

Designed to run unattended

Reagent level, dosing pump status and low-flow trips are alarmed and reported, because odour plant is rarely somewhere anyone visits daily.

Specification

Design envelope

Indicative ranges for this system type. Your figures are calculated against your duty and issued on a datasheet before anything is built.

Odour control scrubbers
Duty range500 – 40,000 m³/h
ArrangementSingle, two or three stage; carbon polishing optional
Stage 1 chemistryDilute sulphuric acid for ammonia and amines
Stage 2 chemistrySodium hydroxide with sodium hypochlorite for sulphur compounds
H₂S removal99%+ achievable across a staged system
Body materialsGRP or polypropylene; PVDF for hypochlorite-wetted parts
Control loopspH and ORP per stage, with independent dosing
BundingIntegral or separate chemical bunds to 110% of the largest vessel
Compliance

What it is built to

Equipment is one part of a duty holder's obligations. These are the standards and regulations we design this system type against — your own risk assessment and permit conditions still govern.

  • Designed against the site’s odour management plan and permit conditions
  • Chemical storage and bunding to CIRIA C736 principles
  • Hypochlorite and acid systems kept segregated, with separate fill points and labelling
  • UKCA marked; supplied with COSHH data for every reagent in the system

Tell us the duty and we will size it